Analysis🏠 My home

Analysis / Comarcas / Vega de Granada comarca / 18 October 2026

VEGA DE GRANADA ANÁLISIS Y NEGOCIOS SEMANAL

Vega de Granada comarca · No. 4 · Sunday 18 October 2026 · 7-minute read

City of Granada stadium repair, tendered at 2.5 million, finds a builder as La Aurora opens at 4.6 million

(Madrid time)

Granada city council hired a company to repair its municipal stadium, tendered at 2.5 million, which on its own makes up 59.8 per cent when set against the nine works changing status throughout Vega de Granada comarca. The Diputación de Granada, the provincial council, is putting 4.6 million into developing La Aurora, in Ogíjares, a 53.7 per cent share across the 16 tenders whose bidding window remains open.

Repairs to the city of Granada's stadium, tendered at 2.5 million, go to a named company

The stadium outweighs the other eight works combined
  • Los Cármenes has its contractor. Granada city council chose the company GRULOP 21 SL for the repair and waterproofing of the Nuevo Los Cármenes municipal stadium, tendered at 2,544,409.61 euros excluding VAT, that is, before tax. It is published by the Plataforma de Contratación del Sector Público, the official portal where public bodies publish their tenders for works and services, each one a public tender in which companies bid to carry out the job. It is 59.8 per cent of the amount tendered across the nine works in the comarca that change status this week.
  • Armilla and Beas de Granada put names to their crews. HIDRAULICAS Y VIALES SL is listed on Armilla's Plan de Asfaltos 2026, its resurfacing plan for this year, tendered at 413,222.37 euros excluding VAT, and CYR GENIL takes all six lots of the rural roads of Beas de Granada. In Las Gabias, BLISA SERVICIOS 2025 is named on the new boiler for the municipal swimming pool.
  • Federico García Lorca airport renews its terminal. Aena, the company that runs Spain's state network of airports and heliports, closes two contracts at Granada-Jaén airport, the upgrade of the air conditioning in the boarding and check-in areas, with INDICE FACILITY SERVICES, and the refurbishment of the terminal's toilets and offices, with BTG OBRAS Y SERVICIOS.
  • FCC replaces the stolen cable in the city of Granada's street lighting. Granada city council hires a UTE, a temporary joint venture of several companies bidding together for a contract, formed by companies of FCC, the services and construction group, for the replacement of the electrical cables stolen from the street lighting, tendered at 116,424.71 euros excluding VAT. In Gójar, the Plataforma lists the new changing rooms and café at its sports centre, tendered at 627,891.59 euros, as resolved, but has yet to publish which company will build them. The same goes for the pedestrian street in the Barrio La Paz of Pinos Puente, put out to tender by the Diputación, the provincial government, at 134,085.26 euros.

La Aurora in Ogíjares, 4.6 million, leads sixteen open tenders

Ogíjares and the city of Granada hold most of the money at stake

Four auctions close, three in Peligros and one in the city of Granada

The four auctions were open for twenty days
  • Three Peligros auctions ended together on 13 October. Bidding on a home with 87 built square metres, a commercial unit of 83 square metres and another home with no floor area in its notice closed on 13 October on the Portal de Subastas, the BOE's official website where courts and public bodies auction property and anyone who registers can bid. The BOE is Spain's Official State Gazette, which publishes laws and official notices. Each one was a subasta judicial, a public sale ordered by a court.
  • In the city of Granada an 87 square metre home was up for auction. Its court auction closed on 15 October.

Twenty new firms, from veterinary diagnostics to skiing

Fourth week and second fall in a row
  • Four BORME bulletins add up to 20 incorporations. The Boletín Oficial del Registro Mercantil (BORME), the Official Gazette of the Companies Register, where new companies, capital changes and closures must be published by law, lists from 13 to 16 October 20 companies with a registered address in the Vega de Granada comarca, 11 fewer than the previous week, with 60,000 euros of share capital between them, the money the partners put in when founding the company.
  • Fuente Vaqueros welcomes two firms from the same group. TAILORUM OPERATIONS, with 6,000 euros, the largest capital of the week, and TAILORUM IP, with 3,000, were registered in Fuente Vaqueros on 13 and 16 October, according to the bulletins of the 13th and of the 16th.
  • Snow and animal health also start companies. WINTERPRO SKI, devoted to winter sports, is born in the city of Granada with 3,000 euros according to the BORME of 16 October, and TACVET DIAGNOSTICO VETERINARIO, in veterinary diagnostic imaging, according to that of the 13th. ALERUGO HOLDING appears in Huétor Vega in the BORME of the 14th. CAPA MANAGEMENT 2024 in Alhendín and AUTOBOX GRANADA in Peligros appear in that of the 15th.

Atarfe opens 12,400 euros for Three Kings floats and Valderrubio 15,500 for associations

Town councils sign 14 of the 28 entries
  • Atarfe and Valderrubio open applications for residents and associations. Atarfe town council registered on 15 October in the Base de Datos Nacional de Subvenciones (BDNS), the National Grants Database, the public register where every administration announces its grants, its grants for floats and street parades in the 2027 Three Kings procession. It shares out 12,400 euros among individuals, and applications can be made within 20 calendar days of its summary appearing in the Boletín Oficial de la Provincia, the Provincial Official Gazette. Valderrubio registered its call for associations on the same day, with 15,500 euros and 10 calendar days to apply.
  • The Diputación opens a line that municipalities apply for. The Diputación de Granada registered on 16 October the call for municipal projects against depopulation, the notice that opens the window to apply for a grant. It is for town councils and local bodies to apply, not individuals.
  • The Andalusian government adds Plan Renove, help for working families and journalism. The Junta de Andalucía, the regional government, amended its Plan Renove for vehicles, its car replacement scheme, and registered three lines for balancing work and family, milk recording and the Premios Andalucía de Periodismo, its journalism awards. The Diputación is running a flash fiction contest against gender violence.
  • PROVIVIENDA receives two programmes from the city of Granada. Granada city council registered on 15 October two programmes with the organisation PROVIVIENDA, for temporary housing, with 81,517.80 euros, and for Housing First, with 80,000.

See on the CASAS.ES map the CasasValue of any building in the city of Granada or in Cenes de la Vega

In the eight days to 17 October, the city of Granada, the provincial capital, chose a company to repair its stadium, tendered new pipes for Don Bosco and saw one more court-ordered property auction wind up. Armilla, Beas de Granada and Las Gabias contracted resurfacing, country roads and a pool boiler. Gójar, with its changing rooms, and Pinos Puente, with the Barrio La Paz, lack a named contractor so far. Ogíjares, Atarfe, Santa Fe, Huétor Vega, Alfacar, Pinos Genil, Villa de Otura, Albolote and Peligros, which closed three auctions, still accept offers. Maracena, Vegas del Genil, Alhendín, Pulianas, Huétor de Santillán, Monachil, Jun, La Zubia, Cenes de la Vega and Fuente Vaqueros, with two new companies, still expect a contractor. Atarfe and Valderrubio opened calls for applications. Nothing specific to Chauchina, Láchar, Churriana de la Vega, Cijuela, Cúllar Vega, Cájar, Dílar, Güéjar Sierra, Quéntar, Dúdar, Víznar, Nívar, Calicasas, Güevéjar or Cogollos de la Vega turned up this week.

Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Vega de Granada Análisis y Negocios Semanal is published by CASAS.ES.

📰 Journalist or publisher? You can republish this analysis and its charts for free under CC BY 4.0, as long as you credit CASAS.ES and link to this page.

Source: CASAS.ES, Vega de Granada Análisis y Negocios Semanal, 18 October 2026. https://casas.es/en/analysis/vega-de-granada/2026-10-18/city-granada-stadium-repair-tendered/

RSS