Mar Menor comarca · No. 7 · Monday 9 November 2026 · 5-minute read
San Javier and Los Alcázares now have buyers for the land and assets they tendered at 6.65 million
CASAS.ES Newsroom · AI · Official sources
(Madrid time)
The Mar Menor comarca sees Zapata Projects take the municipal assets San Javier was selling, while Terrazas de Alicante secures two publicly owned sites sold by Los Alcázares, with 6.65 million tendered between both deals. No other comarca, of the 21 covered today, closes a municipal sale like this. Also, Junco Strategic Investments accounts for 97 in every 100 euros subscribed by nine newly founded companies, and Roldán awaits builders for its roundabout until the 27th.
Zapata Projects and Terrazas de Alicante are awarded the assets sold by San Javier and Los Alcázares

- Zapata Projects is awarded the assets San Javier auctioned. The Pleno of San Javier city council, the full council, all councillors chaired by the mayor, has resolved, meaning the tender is over and the contract has been closed, the sale of various council-owned assets, tendered at 4,242,813.89 euros before VAT, before taxes. The Procurement Platform, the official portal where public bodies publish their tenders for works and services, updated it on Monday 2 November and lists Zapata Projects as the successful bidder.
- Terrazas de Alicante is awarded the public land of Los Alcázares. The Junta de Gobierno of Los Alcázares has awarded, the step in which the public body chooses the company that will do the work, the sale of two plots from its Municipal Land Assets, tendered at 2,411,971.79 euros before VAT. The Platform updated it on Wednesday the 4th and Terrazas de Alicante appears as the successful bidder.
- Pinatar's two-plot sale, settled since October. No other comarca, of the 21 covered today, has a municipal sale resolved or awarded this week. San Pedro del Pinatar had already resolved back in October the sale of two of its plots, tendered at 284,551.14 euros, with Bioimpoluta and Horadada Rentals as the successful bidders.
Roldán, the Torre-Pacheco library and San Pedro del Pinatar await bids worth 649,570 euros until the 27th

- San Pedro del Pinatar switches its streetlights to LED. The town council published on Friday the 6th the tender, a public competition in which companies submit bids, for the supply and installation of LED luminaires for the municipality's outdoor lighting with LED, the technology that produces light in a solid-state device when an electric current passes through it, at 65,495.67 euros before VAT. Bids are accepted until Monday 23 November.
- Three Torre-Pacheco projects, 584,074.45 euros, with deadlines still open. Today, Monday the 9th, is the final day for the repair of the low voltage installation at the Roldán sports centre, 256,232.62 euros. On Wednesday the 11th the grounds and trees of the municipal library close, 24,770.16 euros, and on 27 November the roundabout joining avenida de Balsicas and avenida de Murcia in Roldán, 303,071.67 euros.
- Four files, including 1.55 million for runoff, still under review. Still under review, as the public body is assessing the bids, are San Javier's works to retain and improve runoff water, 1,546,389.66 euros. Also waiting are the solar lighting for the RM-F34 cycle lane, 152,320 euros, the Christmas lights in Los Alcázares, 99,702.96 euros, and the drafting of the La Calavera special plan, 80,844.54 euros.
Turf for two Torre-Pacheco pitches, lights at Los Bastidas and roads in San Javier, 975,448 euros resolved

- Artificial turf for two stadiums, Torre-Pacheco's and Roldán's. The Platform updated them this week as resolved, with Obras y Pavimentos Especiales as the successful bidder: the replacement of the turf on the 11-a-side football pitch in Torre-Pacheco, tendered at 300,627.54 euros before VAT, and that of the Roldán football pitch, 254,195.91 euros.
- Vectoris, awarded the streetlights of the Los Bastidas industrial estate. Also resolved is the upgrade of the street lighting at the RM-F29 junction with the RM-313, the Los Bastidas industrial estate, the San Cayetano road and the hamlet, tendered at 175,443.18 euros.
- File resolved to repair San Javier roads after the DANA. The repair of San Javier's municipal roads damaged by the March 2025 DANA, an isolated low-pressure system high in the atmosphere, which can bring heavy rain, is listed as resolved. It was tendered at 245,181.76 euros. The four resolved this week total 975,448.39 euros.
Junco Strategic Investments starts up in San Javier with 880,252 euros subscribed by its partners

- Junco Strategic Investments puts in 97 of every 100 euros subscribed. The nine new companies in the Mar Menor comarca total 911,252 euros of share capital, the money the partners put in when founding the company, according to the BORME, the Official Gazette of the Companies Register, of 3, 4 and 5 November. Junco Strategic Investments, of San Javier, puts in 880,252 euros. That is three fewer companies than the 12 of the week before.
- Bricks and property feature in the activities of four firms. Round Eggs Estate starts up in Los Alcázares with 5,000 euros, joined by a builder in San Javier and another in Torre-Pacheco, with 3,000 euros each. A fourth, an awnings firm in San Pedro del Pinatar, also includes refurbishment and construction in its objeto social, the activities the company states in its articles that it will carry on.
- Tourism, audiovisual and farming, with regional grants just announced. The tourism department announced on Wednesday the 4th grants to improve private tourism establishments. The Instituto de Industrias Culturales, on Monday the 2nd, grants for the audiovisual industry, and the agriculture department, on Tuesday the 3rd, the 2027 call for areas with natural constraints, the notice that opens the window to apply for a grant. The amount and deadline of each can be checked at its link.
Check the CasasValue of buildings in Los Alcázares and San Pedro del Pinatar using the CASAS.ES map
San Javier handed several of its own properties over to Zapata Projects. Los Alcázares awarded two plots to Terrazas de Alicante. Torre-Pacheco resolved two turf contracts for its pitches and the Los Bastidas lighting one, and has three other tenders pending. San Pedro del Pinatar tendered LED luminaires, and two new firms were registered there.
Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Mar Menor Análisis y Negocios Semanal is published by CASAS.ES.