Madrid Sur comarca · No. 4 · Monday 19 October 2026 · 7-minute read
The Madrid Sur comarca holds 21 unawarded tenders worth 28.3 million, but the Móstoles theatre has its builder
(Madrid time)
Across the Madrid Sur comarca, 21 tenders of 100,000 euros or more, with 28.3 million at stake, sit unawarded, and Fuenlabrada and Navalcarnero account for 61 of every 100 euros. Móstoles hands its 2.46 million theatre to ABALA INFRAESTRUCTURAS, another 14 tenders totalling 7.4 million can still receive offers, and 52 new companies appear, three from the XEDICON group in Arroyomolinos.
Arroyomolinos sees three companies from one group set up for pools and buildings, and Leganés adds ten newcomers

- XEDICON registers three companies in Arroyomolinos at once. The Boletín Oficial del Registro Mercantil (BORME), the Official Gazette of the Companies Register, of 13 October registers XEDICON PROYECTOS Y OBRAS SL, which will build and waterproof swimming pools, with 42,475 euros of share capital, the money the partners put in when founding the company and not what it turns over, XEDICON LIMPIEZA DE EDIFICIOS SL, for buildings and owners' associations, with 36,397, and XEDICON MANTENIMIENTO DE PISCINAS SL, with 15,422. Together they hold 94,294 euros, 28.2 per cent of the 334,645 gathered by the 52 new companies in the Madrid Sur comarca.
- Six newcomers will work in building, refurbishment or housing. Parla sees the birth of RAYO MADRILENO REFORMAS Y ELECTRICIDAD SL and Valdemorillo that of MAEX ACONDICIONAMIENTO Y OBRA SL (BORME of the 14th), and Alcorcón that of CONSTRUCCIONES CONSUGAMA SL (BORME of the 15th). ESTUDIO CIUDAD DE FUENLABRADA 2026 SL, the largest of the six with 4,000 euros, DISTRITO PARLA EL FRESCOR SL and PARLA ESTE GESTION SL, based in Navalcarnero, appear on the 16th.
- Leganés adds ten newcomers and leads the tally. Fuenlabrada and Arroyomolinos follow, with six each, according to the BORME of 16 October and the three issues before it. Almost eight in ten start small, with 3,000 euros or less, so the serious money of the week sits in very few hands.
Móstoles picks the firm behind its 2.46 million theatre, and Alcorcón settles three school, sport and campus contracts

- The Nuevo Teatro del Caleidoscopio goes to ABALA INFRAESTRUCTURAS. Móstoles city council this week completed the award, the step in which the public body chooses the company that will do the work, of the works on the theatre of the Centro Sociocultural Caleidoscopio and the Junta de Distrito 3 district board, on avenida Carlos V. They were put out to public tender, in which companies bid to carry out works or a service, for 2,458,417.99 euros excluding VAT, that is, before VAT. The council also marked as resolved the footpath with the demolition of the old bridge and a new bridge, tendered at 308,373.34. That tender is already resolved, that is, it is over and the contract has been closed, although the notice does not say which company will carry it out.
- Alcorcón sees three contracts resolved, together worth 363,744 euros before tax, and the university Rectorate oversees one. FLODI SL repairs the Escuela Infantil Gloria Fuertes nursery school (45,598.42 euros excluding VAT), EBONE SERVICIOS EDUCACIÓN DEPORTE installs five outdoor training stations (215,700) and Eulen, a Spanish cleaning, security and maintenance services company, refurbishes the toilets of the Restauración building on the Campus de Alcorcón of the Universidad Rey Juan Carlos (102,445.93).
Moraleja de Enmedio entrusts its cemetery, its pool and a school to a single company, tendered at 365,306 euros excluding VAT

- EXITORUM signs the three Moraleja contracts. They are the extension of the municipal cemetery, tendered at 114,935.27 euros excluding VAT, the refurbishment of the municipal swimming pool, at 167,725.87, and the maintenance of the Santa Teresa school, at 82,644.62.
- Valdemorillo renews pavements and Villanueva de Perales makes its school more efficient. Trento arquitectura will renew the pavements of calle San Juan and avenida de Segovia, tendered at 297,520.68 euros, and the kiosk in the La Nava park, of 2,500, is resolved, although the notice does not say which company will build it. SYCO SISTEMAS E INSTALACIONES will improve the energy efficiency of the Cristo de la Campana school, for 82,630. The six works add up to 747,956.44 euros excluding VAT.
Builders have 7.4 million in 14 live deadlines across the Madrid Sur comarca, and three expire today, Monday

- Today, Monday 19, three deadlines worth 2.3 million expire. They are Alcorcón's 2026 Asphalting Plan, tendered at 1,643,344.05 euros excluding VAT, the artificial turf of the 11-a-side football pitch at the Paseo del Prado sports centre in Valdemoro, at 423,142.11, and the speed bumps of Getafe, at 246,878.14.
- Moraleja de Enmedio and Navalagamella close on Tuesday. The asphalting of the Moraleja town centre goes out at 371,862.46 euros and the green space with children's play area in Navalagamella at 161,245. The Getafe Air Base stops taking bids on Wednesday 21 for the repair of its heating network, at 56,074.60, and Parla accepts bids until the 26th for the green corridor on avenida Sistema Solar and Saturno, at 1,652,864.73.
- Navalagamella keeps a residential centre concession open until January. Under the concession a company will build and run the centre. It accepts bids until 25 January 2027 and is tendered at 1,658,422.95 euros. Getafe awaits proposals until 29 October for two free-use sports facilities and a multisport court.
- Torrejón de la Calzada waits until the 29th for whoever wants to smarten up calle Ávila. The comprehensive plan to restore the area around calle Ávila and the Parque Griñón is tendered at 303,245.27 euros excluding VAT. The Getafe Air Base accepts bids until the 30th for the repair of the roof of the officers' pavilion, at 48,197.10.
Navalcarnero and Fuenlabrada await contractors for 17 million in three large tenders

- Navalcarnero is choosing the operator of its 6.5 million funeral complex. The management of the Complejo Funerario and the extension of the cemetery is tendered at 6,488,714.25 euros excluding VAT and no longer accepts bids. Fuenlabrada is studying the bids for the footbridge over the railway tracks, at 5,533,500, and those for the framework agreement for Environment and Public Space works, a contract that sets, for several years, the terms of the jobs given to one or more companies, at 5,000,000.
- Alcorcón and Móstoles assess their sports and neighbourhood works. Alcorcón is assessing Phase 1 of the Ensanche Sur sports complex, at 2,498,929.99 euros, and Móstoles the framework agreement for its participatory budgets, at 2,479,338.84. In all, 21 tenders of this size add up to 28.3 million still without a company, among them those of Pinto, Torrejón de la Calzada, Moraleja de Enmedio and three of the Getafe Air Base.
- Alcorcón offers land for affordable rental housing. The land concession is for a company to develop affordable rental accommodation. The bidding period has already closed and the notice publishes no amount.
Humanes de Madrid, Fuenlabrada and Leganés open calls, and Valdemoro has closed bidding on a 90 metre home

- AEFSUR, the Fuenlabrada Business Association, receives the money for the Feria Fuenlavidad. On 16 October Fuenlabrada city council registered in the Base de Datos Nacional de Subvenciones (BDNS), the National Grants Database, the convenio with that association, an agreement through which the council funds a specific organisation, for its 2026 fair. Leganés is holding the Christmas decoration and lighting contest for homes, with the rules in its record.
- Four calls accept applications. Fuenlabrada opens the FUENCOLES 2026-2027 programme, Humanes de Madrid the grants for textbooks and school supplies for the 2026-2027 school year and the Comunidad de Madrid the Plan Corresponsables, with grants for local authorities. With the Leganés Christmas contest that makes four. Who can apply, how much and until when is set out in each official record.
- Five more lines arrive for wineries and municipalities. On the 16th came the line for investment in wine processing for 2027, with European farm funds, and on the 13th the four lines of the Plan de Reequilibrio Territorial (head towns, population centres and supramunicipal).
- Valdemoro's court auction, the comarca's sole one, ended on the 13th. It was a court auction, a public sale ordered by a court, in which anyone can bid, on the Portal de Subastas, the official website of the BOE, the Boletín Oficial del Estado, Spain's Official State Gazette, where courts and public bodies auction property. The property was a home of 90 registered square metres.
Compare the buildings of Leganés, Fuenlabrada or Valdemoro by their CasasValue on the map
The Madrid Sur comarca has 21 tenders of 100,000 euros or more sitting unawarded, with Fuenlabrada and Navalcarnero at the top and Alcorcón, Móstoles, San Martín de Valdeiglesias, Pinto, Getafe, El Álamo, Sevilla la Nueva, Leganés, Torrejón de la Calzada and Moraleja de Enmedio behind them. Móstoles chooses the constructor of its new Caleidoscopio theatre and in Alcorcón three school, sport and campus contracts are settled. Moraleja de Enmedio, Valdemorillo and Villanueva de Perales resolve six works. Bidding is still under way in Alcorcón, Valdemoro, Getafe, Moraleja de Enmedio, Navalagamella, Parla, Rozas de Puerto Real and Torrejón de la Calzada. In all, 52 companies are born: ten in Leganés, six in Fuenlabrada, six in Arroyomolinos and the remainder spread across Móstoles, Getafe, Navalcarnero, Humanes de Madrid, Parla, Pinto, Alcorcón, Valdemoro, Casarrubuelos, Valdemorillo and San Martín de Valdeiglesias. Humanes de Madrid, Fuenlabrada and Leganés open calls, and in Valdemoro bidding on the flat has ended. Batres, Griñón, Villamantilla, Colmenarejo, Cenicientos, Villa del Prado, Navas del Rey, Cubas de la Sagra, Quijorna, Torrejón de Velasco, Chapinería, Serranillos del Valle, Aldea del Fresno, Colmenar del Arroyo, Pelayos de la Presa, Villamanta and Cadalso de los Vidrios produced no story of their own from 11 to 18 October.
Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Madrid Sur Análisis y Negocios Semanal is published by CASAS.ES.