El Bierzo comarca · No. 2 · Friday 16 October 2026 · 5-minute read
ACTI SOLUCIONA SL gives Ponferrada the top building and property capital of 21 comarcas, 134,000 euros
CASAS.ES Newsroom · AI · Official sources
(Madrid time)
With 134,000 euros, Ponferrada's ACTI SOLUCIONA SL outranks 66 other fresh real estate and building firms in the 21 comarcas where CASAS.ES publishes. Offers to fit climate control at the Bembibre clinic, in the El Bierzo comarca, are due by 26 October, a contract worth 331,724.79 euros before VAT.
No other building and property firm in 21 comarcas matches the 134,000 euros of Ponferrada

- A well-funded rental firm opens in Ponferrada. ACTI SOLUCIONA SL is in the 14 October Official Gazette of the Companies Register, where new companies must be published by law, with 134,000 euros of share capital, the money the partners put in. That is 97.1 per cent of the 138,000 euros of new capital in the El Bierzo comarca.
- Ponferrada adds a second management firm. RENOVA 3 HUB SOCIEDAD LIMITADA, which manages holiday homes and tourist apartments, registered the same day in Ponferrada with 3,000 euros.
- Sobrado welcomes a new builder. A company bearing a person's name registered on 8 October with 1,000 euros to build homes, do public works and rent property.
Bembibre and San Andrés de Montejos keep three contracts worth 515,526 euros open to offers

- Bembibre plans cooling and heating at its health clinic. The Gerencia de Asistencia Sanitaria del Bierzo lists on the Plataforma de Contratación, the official portal where public bodies publish their tenders for works and services, climate control for Bembibre's health centre, tendered at 331,724.79 euros before VAT. It is a public tender in which companies bid, until 26 October.
- San Andrés de Montejos wants more of its court covered. Ponferrada city council is commissioning design and works to extend the sports court roof, tendered at 99,173.55 euros before VAT, until Monday 19.
- The Festival del Botillo seeks a contractor. Bembibre is contracting services for the 54th Festival Internacional de Exaltación del Botillo, tendered at 84,628.10 euros before VAT, with bids until 17 November.
Camponaraya, Bembibre, Priaranza and Ponferrada hand six works to contractors

- Camponaraya goes to CONSURVI DEL BIERZO. The La Válgoma pavements, tendered at 44,412.46 euros before VAT, and streets in several villages, at 59,274.88, go to it.
- The Casa Moruna is being restored. TÉCNICAS CONSTRUCCIÓN SEVEMUL has the restoration of the Casa Moruna in Camponaraya, tendered at 98,922.43 euros before VAT. Ovisa Pavimentos y Obras gets streets in Bembibre and San Esteban del Toral, at 138,341.78.
- Compostilla, Priaranza and Almázcara close their tenders. MONDO IBERICA will renew the Compostilla football pitch turf, in Ponferrada, tendered at 164,832.30 euros before VAT, and Obras y Construcciones Serjo the Priaranza del Bierzo works, at 167,342.90. The Almázcara municipal building, in Congosto, tendered at 175,638.93, appears resolved without a company.
From Carracedelo to Toreno, eight contracts worth 855,185 euros sit between closing and choosing

- Carracedelo has two urbanisation projects pending. The Calle del Campo, tendered at 185,950.41 euros before VAT, and finishing streets in Posada del Bierzo, at 190,082.64, still have no company.
- Ponferrada and the Mancomunidad Agua del Bierzo compare bids. Ponferrada city council weighs bids for the Camino de Santiago lighting and street furniture, tendered at 107,438.02 euros before VAT, and the Mancomunidad de Municipios Agua del Bierzo, a grouping of town councils that provide a service together, those for machinery hire with driver, at 104,500.
- Four more have closed bidding. They are the Bembibre parks, tendered at 103,654.36 euros before VAT, the Toral de los Vados cemetery wall, at 66,285.14, Calle Los Tilleros in Toreno, at 50,309.76, and the Calle Espíritu Santo wall in Villafranca, at 46,965.07.
EXCARBI SL wins four Ponferrada streets, one of seven contractors sharing ten jobs

- EXCARBI SL lines up four works in Ponferrada. EXCARBI SL will build the neighbourhood access roads, tendered at 104,595.87 euros before VAT, the Ciudad Bérgida and Camino Francés urbanisation, at 156,300.76, and the Galicia and Astorga avenues, at 74,018.94 and 74,379.45.
- Six more contracts are spread across the comarca. In Toreno, Orus Eléctrica has the street lighting, at 143,700.67, and JOBENSA SOLUCIONES EN ELEVACIÓN the town hall lift, at 87,781.54. Maga Estudios y Construcciones gets public spaces in Vega de Espinareda, at 225,894.30, Técnicas Construcción Sevemul the Toral de los Vados roofs, at 199,052.56, DAFRICA BIERZO the Ponferrada IV health centre climate control, at 140,720, and CONSURVI DEL BIERZO the Teatro Gil y Carrasco in Villafranca, at 80,064.11.
Birth grants in Villafranca and culture in Vega de Espinareda open for applications

- Villafranca del Bierzo launches birth grants. On 13 October the town council registered in the National Grants Database, the public register where grants are announced, its 2026 birth grants, rules at the link, and earmarked grants for its village councils, each with a set recipient.
- Vega de Espinareda opens its culture window. Its governing board, the Junta de Gobierno, approved on 9 October the 2026 cultural activities call, the notice that opens the window to apply for a grant.
- Ponferrada gives its share to local retail. On 9 October Ponferrada city council registered the earmarked grant for the Asociación de Comercio.
- The province adds three more lines. The Diputación de León, the provincial council, registered on 8 October the Plan Juntas Vecinales 2026-2027, for the juntas vecinales, the body governing a village with its own administration inside a municipality. On the 14th the Instituto Leonés de Cultura called 2026 grants for Traditional Carnivals and cinemas.
See on the CASAS.ES map the CasasValue of any building in the city of Ponferrada
Between 8 and 15 October the El Bierzo comarca registered three companies with 138,000 euros, two in Ponferrada, including ACTI SOLUCIONA SL, and one builder in Sobrado. Bembibre keeps its health centre climate control and Botillo contracts open, the city of Ponferrada the roofed extension of the San Andrés de Montejos sports court. Camponaraya, Priaranza del Bierzo and Congosto awarded or resolved works, Carracedelo, Toral de los Vados and the Mancomunidad Agua del Bierzo await their contractor, Toreno and Vega de Espinareda do, and Villafranca del Bierzo opened its 2026 birth grants. Molinaseca, Oencia, Balboa, Folgoso de la Ribera, Arganza, Igüeña, Vega de Valcarce, Castropodame, Páramo del Sil, Cubillos del Sil, Corullón, Sancedo, Carucedo, Trabadelo, Fabero, Noceda del Bierzo, Berlanga del Bierzo, Torre del Bierzo, Barjas, Cabañas Raras, Peranzanes, Borrenes, Valle de Ancares, Cacabelos and Puente de Domingo Flórez recorded neither a local tender nor a local BORME incorporation between 8 and 15 October.
Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. El Bierzo Análisis y Negocios Semanal is published by CASAS.ES.