Sur de Tenerife comarca · No. 8 · Sunday 15 November 2026 · 5-minute read
Tamaimo's funeral home, €1,659,568 before VAT, is 50.3% of fresh Sur de Tenerife comarca tendering
CASAS.ES Newsroom · AI · Official sources
(Madrid time)
Sur de Tenerife comarca tendering this week is led by Santiago del Teide, whose Tamaimo funeral home is priced above the remaining three new contracts put together, two from Candelaria and one in Güímar. That town council also shares out €100,000 among shops affected by roadworks.
The Tamaimo funeral home accounts for €1,659,568 of the €3,297,533 before VAT tendered since Monday 9

- Tamaimo carries the biggest new price tag in the south. On Monday 9 Santiago del Teide published the tender for the Tamaimo funeral home, a public tender where firms bid, at €1,659,568 before VAT, that is, before tax. It is 50.3% of the new tenders and takes bids until 1 December.
- Candelaria finishes its streets and moves its paperwork online. Candelaria town council tenders phase II of the resurfacing of its streets at €913,168 before VAT, and its electronic administration at €176,700.
- The IASS wants cooling at Güímar's Reina Sofía centre. The IASS, Tenerife's Island Institute for Social and Health Care, tenders the air conditioning of the Reina Sofía centre in Güímar at €548,096 before VAT.
- Earlier calls in Fasnia, Granadilla de Abona and Adeje stay open. The seven open tenders total €4,260,421 before VAT. The Las Eras seafront promenade, in Fasnia, tendered at €739,584 by the Cabildo de Tenerife, the island government in the Canary Islands, closes on Monday 16. Still open are the Canalink offices in Granadilla de Abona (€169,021) and the Las Nieves stage in Adeje (€54,283).
Sanipeques, a nursery's wiring and a football canteen close their tenders, which had been put out at €838,079 before VAT

- Sanipeques grows in Granadilla de Abona. Granadilla de Abona completed the award, the step in which it chooses the company, for the extension of the Sanipeques nursery school, tendered at €665,631 before VAT.
- SEDAFEL and Grupo Negrín take two Santiago del Teide jobs. SEDAFEL S.L. will carry out the electrical installation of the Tamaimo nursery and play centre, tendered at €121,046 before VAT, and Grupo Negrín Canarias SL the refurbishment of the football ground canteen in Puerto de Santiago, tendered at €51,402 before VAT.
Arona's resurfacing and Guía de Isora hold 66.6% of the €8,042,960 before VAT still pending

- Guía de Isora wants firms on call for minor works. Its dynamic works system, an open list of approved firms invited to bid for each job, tendered at €2,769,250 before VAT, has a deadline of 16 March 2027. With Arona's 2026 resurfacing plan, put out at €2,584,065, it makes up 66.6% of what is waiting.
- Tennis, football and leisure wait in three municipalities. Santiago del Teide is weighing up the La Hondura tennis court (€503,791 before VAT) and the Tamaimo Youth Centre (€131,302), Fasnia the Miguel Díaz football ground (€476,249) and Arafo the Centro de Ocio y Artesanal del Pino, its leisure and crafts centre (€503,585).
- Los Cristianos awaits its avenue. Arona is also assessing the refurbishment of Avenida Los Sabandeños, tendered at €354,515 before VAT.
- Fans, Christmas decorations and two deadlines that expired in October. Candelaria is studying the fans for five schools (€247,924 before VAT) and the Christmas decorations (€278,505). The Arguayo ethnographic park and the El Médano sports centre closed for bids on 16 and 5 October.
Los Roques tops the earlier awards and Aena resolves eight works in Granadilla de Abona

- Fasnia commissioned its Los Roques farmers' market. The company Satocan, S.A. will build the Mercado del Agricultor Comarcal de Los Roques, a farmers' market for the district, tendered at €3,919,409 before VAT, 58.5% of the €6,697,409 of the eleven municipal contracts awarded or resolved before this week. Resolved means the tender is over and the contract closed.
- Grupo Negrín Canarias adds padel, a pavement and a canteen. It holds the padel courts in Puerto de Santiago (€457,071 before VAT), the pavement on Calle Valle Menéndez, in Los Cristianos (€59,987), and the canteen.
- Architects and engineers draw up Los Olivos and San Isidro. An architecture practice is drafting the protected housing at Los Olivos, in Adeje (€608,253 before VAT), and a temporary joint venture, firms teaming up to bid jointly, the San Isidro urbanisation works (€307,516).
- Arafo, Adeje and Guía de Isora split what remains. ECO STEEL PROYECTOS ESTRUCTURAS Y CONSTRUCCIONES SLU is replacing the roof of the Arafo Auditorium (€432,286), Garden Ika, S.L. the Jardín del Encuentro in Adeje (€88,053) and COMPAÑIA MERCADILLOS DEL ATLÁNTICO SL the Guía de Isora marquees (€130,732).
- Aena has eight resolved works in Granadilla de Abona. Aena, the company that runs Spain's state network of airports, tendered eight works at Tenerife Sur Airport at €2,095,015 before VAT, now resolved. The largest, the security checkpoint, is in the hands of PROYECTOS SIMEON GH SL (€727,750), and SANTA CRUZ DE OBRAS Y PROYECTOS SL holds three.
Santiago del Teide opens grants for roadwork-hit retailers, the Canary Islands two more calls

- Santiago del Teide compensates its shops for long roadworks. On Wednesday 11 it opened its call for applications, the notice that opens the application period, for shops affected by long works in the street, with €100,000 for SMEs and people with an economic activity. There are fifteen working days, excluding weekends and public holidays, from its appearance in the Boletín Oficial de la Provincia.
- Firms that train students and rural projects have calls. The education department of the Gobierno de Canarias calls grants for companies that hosted Formación Profesional, vocational training, students in 2025/2026, and its agriculture department the 2027 call for community-led local development, the plan for an area that its local action group carries out.
Check the CasasValue of any building in Güímar, Arona or Granadilla de Abona on our map
Sur de Tenerife comarca tendering adds €3,297,533 before VAT in fresh contracts. Santiago del Teide tenders the Tamaimo funeral home and subsidises shops, Candelaria its streets, the IASS cools a centre in Güímar and in Fasnia the island's coastal works at Las Eras accept envelopes until Monday 16. Granadilla de Abona awards Sanipeques and hosts the eight Aena works, Adeje has the Las Nieves stage open, Arona's asphalt plan, Guía de Isora's works roster and Arafo's Pino crafts hall all lack contractors. Arico, San Miguel de Abona and Vilaflor de Chasna record no new contracts.
Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Sur de Tenerife Análisis y Negocios Semanal is published by CASAS.ES.