Analysis🏠 My home

Analysis / Comarcas / Santa Cruz de Tenerife comarca / 26 October 2026

SANTA CRUZ DE TENERIFE ANÁLISIS Y NEGOCIOS SEMANAL

Santa Cruz de Tenerife comarca · No. 5 · Monday 26 October 2026 · 7-minute read

La Laguna hands 28 million in Tejina and El Cardonal to builders as Tíncer and Barranco Grande close Tuesday

(Madrid time)

Across the Santa Cruz de Tenerife comarca, San Cristóbal de La Laguna now has builders assigned to 28 million euros of tendered works, the 50 protected homes in Tejina and the five lots regenerating El Cardonal. The city of Santa Cruz de Tenerife stops accepting offers for the Tíncer and Barranco Grande football pitches on Tuesday 27 October, and Tegueste brings together 410,000 euros across three neighbourhood tenders.

La Laguna assigns firms to 28 million to build in Tejina and regenerate El Cardonal

Santa Cruz de Tenerife, 26 October 2026. El Cardonal is worth twice the Tejina building in money
Euros tendered before VAT for the three files in this section in Tejina and El Cardonal. Santa Cruz de Tenerife, 26 October 2026. Source: Public Sector Procurement Platform (Plataforma de Contratación del Sector Público) · CASAS.ES · CC BY 4.0
  • CITANIAS will build the 50 protected homes in Tejina. MUVISA, the municipal housing and services company of San Cristóbal de La Laguna, now has a builder for the 50-home building in Tejina, put out to tender, that is, offered in a public competition in which companies bid to carry out works or a service, for 8.9 million euros before VAT, in other words before tax. The builder is CITANIAS OBRAS Y SERVICIOS, and the file changed status this week.
  • CONSTRUPLAN wins four El Cardonal lots out of five. The urban regeneration of El Cardonal, phase I, which refurbishes buildings in five lots, is tendered at 19.1 million euros before VAT. It was updated on 19 October with four lots going to the builder CONSTRUPLAN and the fifth to another company.
  • Tejina seeks an inspector for its works until 6 November. On 22 October MUVISA put out to tender the technical control body for the Tejina works, the independent entity that checks the building matches the project, for 28,579 euros before VAT.

Tíncer and Barranco Grande close on Tuesday 27 October, while Mesa Mota and the harbour wait until 16 November

Santa Cruz de Tenerife, 26 October 2026. The two football pitches lead what is still open
Cumulative share of the open tenders in this section, in euros before VAT, from largest to smallest. Santa Cruz de Tenerife, 26 October 2026. Source: Public Sector Procurement Platform (Plataforma de Contratación del Sector Público) · CASAS.ES · CC BY 4.0
  • Tíncer and Barranco Grande accept offers until Tuesday 27 October. The town hall of Santa Cruz de Tenerife accepts offers until Tuesday 27 October for the refurbishment of the Barranco Grande pitch, tendered at 1.8 million, and for the Tíncer pitch, at 1.7 million.
  • Mesa Mota and the port terminals close on 16 November. On 23 October San Cristóbal de La Laguna published the road surface of the Mesa Mota road, tendered at 1.5 million euros before VAT. The Autoridad Portuaria, the port authority that runs the island capital's port, published on the 19th the medium-voltage line for the container terminals, at 1.3 million.
  • Las Mercedes and Taco await a builder until 4 November. Still open are the sports hall at CEIP Las Mercedes, a state infant and primary school, tendered at 1.4 million euros before VAT, and the offices of the Taco deputy mayor's district office, at 206,820 euros. Bidding closes on the 26th for MUVISA's nursery school maintenance and on the 30th for the stage for the port's Christmas Concert, at 51,000 euros.
  • Mercatenerife puts out three tenders. Mercatenerife, the company that runs Tenerife's central wholesale food markets, published on 23 October the new drinking water network, tendered at 290,398 euros before VAT, and access to the second floor of units 1 and 2, at 113,100 euros, with bids until 12 November, and the lighting upgrade, at 20,566 euros, until the 9th.

Los Gladiolos adds 56 homes with refurbishment settled and its block 14 has already received bids

Santa Cruz de Tenerife, 26 October 2026. Six city files, month by month since July
Latest move or deadline for each file on the Procurement Platform, July to October 2026. Santa Cruz de Tenerife, 26 October 2026. Source: Public Sector Procurement Platform (Plataforma de Contratación del Sector Público) · CASAS.ES · CC BY 4.0
  • Blocks 33 and 18 in Los Gladiolos, with 56 homes, show as resolved. Viviendas, Proyectos y Obras Municipales, the capital's housing company, settled blocks 33 and 18 in Los Gladiolos, 56 homes tendered at 927,168 euros before VAT. Block 14, in the same neighbourhood, tendered at 971,376 euros, took bids until 20 October.
  • Council buildings will get photovoltaic panels. The self-consumption solar scheme for council buildings, tendered at 336,170 euros before VAT, has been listed as settled since 23 October, with two companies. The building logbook, tendered at 212,320 euros before VAT, goes to the practice Bilateral Arquitectos. It also settled the maintenance of its e-government system, tendered at 172,000 euros.
  • The Jet Foil, the Dársena power network and the TF-4 road complete the capital's list of public projects. The Autoridad Portuaria has already chosen a company for the former Jet Foil station, tendered at 2.1 million euros before VAT. For the power network of the Dársena de Los Llanos, tendered at 413,650 euros, the administration is studying the bids and has not yet chosen a company. The Cabildo de Tenerife, the island government in the Canary Islands, settled the lighting on the TF-4 road, and the demolition of the San Gerardo church, tendered at 1.8 million, is also settled.

Tegueste brings together 410,000 euros across three neighbourhood tenders and El Rosario awaits a 2 million sewer

Santa Cruz de Tenerife, 26 October 2026. The sewer puts El Rosario ahead of Tegueste
Euros tendered before VAT for the files in this section, with the Tegueste court already awarded. Santa Cruz de Tenerife, 26 October 2026. Source: Public Sector Procurement Platform (Plataforma de Contratación del Sector Público) · CASAS.ES · CC BY 4.0
  • Pedro Álvarez and La Padilla have open tenders in Tegueste. On 19 October Tegueste city council published the accessibility works at the Pedro Álvarez Cultural Centre, tendered at 191,061 euros before VAT, with bids until 9 November, and on the 23rd land infill on Camino La Limera, at 67,290 euros, until the 6th. Open since 16 October, until 5 November, is the wall on Camino de El Monte, at 151,467 euros. ECO STEEL PROYECTOS ESTRUCTURAS Y CONSTRUCCIONES won the roofing of the sports court, tendered at 1.9 million.
  • El Rosario's large sewer awaits a contractor. The Cabildo de Tenerife is still studying the bids for phase 2 of the main sewer in El Rosario, tendered at 2 million euros before VAT. Listed as settled are the development of Verodes street, tendered at 467,290 euros, and, since 20 October, the Los Carriles road, in La Esperanza, tendered at 188,561 euros.
  • Cruz del Carmen and La Laguna town hall's solar installation appear as resolved. The Cabildo settled the upgrade of the Cruz del Carmen visitor centre, tendered at 304,472 euros before VAT, and San Cristóbal de La Laguna the 90-kilowatt solar plant at its town hall, tendered at 185,680 euros.

The Santa Cruz de Tenerife comarca gains 26 new firms, including four property businesses, and the Canarian executive invites applications for five grants

Santa Cruz de Tenerife, 26 October 2026. Two audiovisual groupings account for 7 in every 10 euros
Capital of the 26 companies set up in the comarca, €195,010. Santa Cruz de Tenerife, 26 October 2026. Source: BORME · CASAS.ES · CC BY 4.0
  • The BORME lists 26 companies, up from 21 last time. The BORME of 19 October, the Official Gazette of the Companies Register, where new companies must be published by law, records 26 incorporations in the comarca, 21 in the city of Santa Cruz de Tenerife, 4 in San Cristóbal de La Laguna and 1 in El Rosario, with 195,010 euros of capital, the money the partners put in when setting up the company, not what it turns over.
  • Four target the property market and two are audiovisual groupings. HARMONIA HABITAT will buy and sell property, another firm in the capital will develop housing and, in La Laguna, a property brokerage and development company and the builder TENEGOMCA complete the group. MJ STUDIOS CANARY PRODUCTION and POP ISLAND ESTUDIOS are agrupaciones de interés económico, each a non-profit vehicle whose only purpose is to support its members' own business. The two put in seven in every ten euros of the new capital (BORME).
  • Five regional calls are taking applications. The Canary Islands open grants for STEP strategic technologies, under the EU regulation that sets up the Strategic Technologies for Europe Platform, and the PFAE GJ 2026, one of the Programas de Formación en Alternancia con el Empleo, the Work-Linked Training Programmes, which combine paid work with training. Also open are local job fairs, local egg production and general-interest programmes funded through IRPF, personal income tax.
  • The capital's Chamber, of commerce, industry and shipping, receives its direct grant for 2026. On 19 October the Government of the Canary Islands registered the direct grant order for the Santa Cruz de Tenerife Chamber, money with a fixed recipient, and the Programa Impulso industrial of FEMETE, the provincial federation of metal and new-technology businesses in Santa Cruz de Tenerife, and of its Las Palmas counterpart, with no indication that other companies can apply.

See the CasasValue of any building in Tejina, El Cardonal or Los Gladiolos on the CASAS.ES map

Between 18 and 25 October, MUVISA, the municipal housing and services company of San Cristóbal de La Laguna, lined up builders for the 50 homes in Tejina and for El Cardonal, with its five lots. In the city of Santa Cruz de Tenerife the self-consumption scheme for council buildings shows as resolved, Mercatenerife put out three tenders and the port put out the medium-voltage works for its terminals, bidding for the Tíncer and Barranco Grande pitches ends on Tuesday 27 October, and in Los Gladiolos blocks 33 and 18 now appear as decided. Tegueste put out works in Pedro Álvarez and La Padilla to tender and found a builder to roof its sports court. El Rosario awaits the Cabildo's choice of contractor for its main sewer, and Verodes street and the Los Carriles road have been decided. No court or tax agency sales took place in the comarca over these days, and the BORME publishes 26 newly incorporated firms.

Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Santa Cruz de Tenerife Análisis y Negocios Semanal is published by CASAS.ES.

📰 Journalist or publisher? You can republish this analysis and its charts for free under CC BY 4.0, as long as you credit CASAS.ES and link to this page.

Source: CASAS.ES, Santa Cruz de Tenerife Análisis y Negocios Semanal, 26 October 2026. https://casas.es/en/analysis/santa-cruz-de-tenerife/2026-10-26/laguna-hands-28-million-tejina-cardonal-builders-tincer/

RSS