Analysis🏠 My home

Analysis / Comarcas / Poniente Almeriense comarca / 12 November 2026

PONIENTE ALMERIENSE ANÁLISIS Y NEGOCIOS SEMANAL

Poniente Almeriense comarca · No. 7 · Thursday 12 November 2026 · 5-minute read

Vícar has every public tender left open in the whole Poniente Almeriense comarca, worth 951,653 euros

(Madrid time)

Within the Poniente Almeriense comarca, Vícar town council accepts offers right now, covering the Puebla de Vícar Norte water pipes and for energy savings in its buildings, until 25 and 26 November. Twelve businesses are set up with a combined 89,645 euros, and NELPOP LOGISTIC puts up 60,000.

Puebla de Vícar Norte and the council energy savings take bids for two weeks

Poniente Almeriense, 12 November 2026. Two weeks to bid, and both deadlines fall on consecutive days
Days left, from 12 November, to submit a bid for the only open works in the comarca. Poniente Almeriense, 12 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • Puebla de Vícar Norte will get new water supply pipes. Vícar town council published on 6 November on the Procurement Platform, the official portal where public bodies publish their tenders, the replacement of the Puebla de Vícar Norte water supply network. It is a public tender, in which companies compete, at 400,826.45 euros excluding VAT, before tax, open until 26 November. With it, Vícar holds all the works in the comarca accepting bids today, 951,652.90 euros.
  • Energy savings in Vícar buildings accept bidders. The improvement of the energy efficiency of municipal buildings and facilities remains open, tendered at 550,826.45 euros excluding VAT, with bids until 25 November. It is co-funded by the European Regional Development Fund (FEDER, the European territorial cohesion fund).

A 70,000 cubic metre reservoir in Aguadulce accounts for 79 of every 100 euros already given to builders

Poniente Almeriense, 12 November 2026. The Aguadulce reservoir takes 79 of every 100 euros
Tender amount excluding VAT of the eight works in the comarca that already have a company, largest to smallest. Poniente Almeriense, 12 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • Benínar has its pipe firm picked for the canal service road. This week the replacement of the water supply network on the Canal de Benínar service road, tendered at 194,214.88 euros excluding VAT, was resolved. The Procurement Platform names EXCAVACIONES EL MANOLILLO SLL as the company that will carry it out. Together with Puebla de Vícar Norte, Vícar moved two water networks this week worth 595,041.33 euros in tenders.
  • A 70,000 cubic metre reservoir dominates what is already contracted. The eight works in the comarca with a company add up to 16,869,464.39 euros tendered excluding VAT. The Aguadulce drinking water reservoir, in Roquetas de Mar, which GRUPOCOPSA will build and which was tendered at 13,372,778.41 euros, is 79.3 per cent of it. Next comes the bridge over the Rambla de San Antonio, with JARQUIL CONSTRUCCIÓN, at 2,057,819.57 euros.
  • Four more builders share the rest. MAYFRA OBRAS Y SERVICIOS has the Llanos de Vícar Social Centre and the Pago del Lugar square in Adra. FIRCOSA DESARROLLOS will build the pavements of the Adra seafront promenade and ABDERA 2018 the 304 niches at its cemetery. REHABITEC ALMERIA has the restoration of the Torre de los Cerrillos, paid for in equal shares by Roquetas de Mar and El Ejido.

Six council works, from the Roquetas de Mar niches to a La Mojonera school court, await a company

Poniente Almeriense, 12 November 2026. Three of the six are in Adra, and only one is being assessed
Council works with bidding closed and no company in the data, by stage, excluding VAT. Poniente Almeriense, 12 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • The 716 prefabricated Roquetas de Mar niches still lack a named firm. The Roquetas de Mar cemetery works, tendered at 595,065.87 euros excluding VAT, has had no company since 13 October. It is the largest of the six works waiting like this, which add up to 1,407,004.79 euros.
  • Three Adra schemes saw their window close and no winning firm announced. The refurbishment of the council nursery school closed on 9 November without a company being known, the remodelling of Plaza Ibiza on 26 October and the roof of the municipal swimming pool on 2 November. The three add up to 535,833.97 euros tendered excluding VAT.
  • Vícar is already marking proposals for the sports turf. The replacement of the turf on the seven-a-side football pitches at the Ciudad Deportiva, tendered at 174,883.47 euros excluding VAT, is being assessed. In La Mojonera, the multi-sport court at the San Pedro Apóstol school, tendered at 101,221.48 euros, closed for bids on 4 November.
  • A Roquetas de Mar plot for protected housing appears as resolved. Roquetas de Mar put up for sale a plot from the Municipal Land Assets, council land that the file earmarks for protected housing, tendered at 379,327.53 euros. The Procurement Platform lists it as resolved, with no buyer published.

A Roquetas logistics firm puts up 60,000 of the 89,645 euros raised by twelve newly formed companies

Poniente Almeriense, 12 November 2026. Roquetas de Mar gathers 75,100 euros of the new capital
Capital of the new companies by municipality of registered address, BORME from 4 to 10 November. Poniente Almeriense, 12 November 2026. Source: Official Gazette of the Companies Register · CASAS.ES · CC BY 4.0
  • NELPOP LOGISTIC opens in Roquetas de Mar backed by 60,000 euros. The Official Gazette of the Companies Register (BORME, where every newly formed company is published) of 10 November records the incorporation of NELPOP LOGISTIC. Its share capital, the money the partners put in when founding the company, is 66.9 per cent of the 89,645 euros raised by the twelve new companies in the comarca.
  • Seven of the twelve are born in Roquetas de Mar. From 4 to 10 November, the companies registered in Roquetas de Mar included AST HOLIDAYS (BORME of 4 November), CRH VIP INVERSIONES (5 November) and AGRO INVER GAVTIM (6 November). El Ejido adds two, Adra two and Vícar one, ALMA DE CAMPO 2026.
  • Four property firms gather 13,005 euros of capital. The largest is EMIA LIVING, a developer from El Ejido, with 4,000 euros (BORME). The others are EXPOVIVIENDA ROQUETAS, CRH VIP INVERSIONES and one from Adra.
  • Berja, Dalías and two El Ejido associations have earmarked funds, plus a new provincial call. The Diputación de Almería, the provincial government, gave direct financial assistance to Berja town council and further financial assistance to Dalías town council. El Ejido town council granted direct subsidies to ATHENAA and AMASAL, two cultural associations. These are funds with a set recipient. In addition, the Diputación opened a call for local authorities with up to 10,000 inhabitants that want to digitise songbooks of the province's popular folklore.

See on the CASAS.ES map the CasasValue of the buildings in Roquetas de Mar or El Ejido

Vícar, a town inside the Poniente Almeriense comarca, holds all the live tenders and moves two water pipe projects, Puebla de Vícar Norte and Benínar. Roquetas de Mar has the largest work already contracted, the big water reservoir, and a new bridge in Aguadulce, while its 716 niches wait their turn. Adra lacks contractors to do up its nursery school, one square and the pool, and La Mojonera lacks one to resurface a playground court. El Ejido co-funds a tower under restoration with Roquetas, and between them the two gather nine new companies. Berja and Dalías receive assistance from the Diputación. As for Balanegra, Enix and Felix, none of them contributes a single entry between 4 and 11 November.

Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Poniente Almeriense Análisis y Negocios Semanal is published by CASAS.ES.

📰 Journalist or publisher? You can republish this analysis and its charts for free under CC BY 4.0, as long as you credit CASAS.ES and link to this page.

Source: CASAS.ES, Poniente Almeriense Análisis y Negocios Semanal, 12 November 2026. https://casas.es/en/analysis/poniente-almeriense/2026-11-12/vicar-public-tender-left-open-whole-worth-951653-euros/

RSS