Madrid Sur comarca · No. 7 · Monday 9 November 2026 · 6-minute read
Fuenlabrada hands its footbridge over the railway to ACSA and Llorente, tendered at 5.53 million before VAT
CASAS.ES Newsroom · AI · Official sources
(Madrid time)
Within the Madrid Sur comarca, the joint venture of ACSA and Construcciones y Obras Llorente will build Fuenlabrada's footbridge across the railway. That footbridge, worth 5,533,500 euros before VAT, by itself tops the 5.16 million of the 11 tenders still open. Navalcarnero settles Phase III of the Arroyo Juncal sports complex with two builders, Madrid's housing ministry opens 8 million in urgent renovation grants in the Sierra Oeste and the comarca welcomes 53 new companies.
The Fuenlabrada crossing and the Navalcarnero complex scoop up nearly every euro settled this week

- Fuenlabrada hires two builders to take walkers across the railway. The Procurement Platform, the official portal where public bodies publish their tenders for works and services, lists the footbridge over the railway tracks and the redevelopment of its surroundings as awarded to the joint venture of ACSA Obras e Infraestructuras, a construction company in the Sorigué group, and Construcciones y Obras Llorente. The job went out to tender, a public tender in which companies bid to carry out works or a service, at 5,533,500 euros before VAT. With that award, the step in which the public body chooses the company that will do the work, the project now has its builders. This one job alone accounts for more than half of the 9.67 million tendered across the seven contracts closed this week.
- Navalcarnero settles Phase III of the Arroyo Juncal complex. Phase III of the Sports City on Avenida Arroyo Juncal, tendered at 3,892,905.74 euros before VAT, is now settled, meaning the tender is over and the contract has been closed, with Obras y Pavimentos Especiales and Construcciones Glesa. Together with the Fuenlabrada crossing, the two works take almost all the money settled in the comarca this week.
- Chapinería, Getafe and Pinto close smaller contracts. Chapinería has settled the renewal of Calle Procesiones, tendered at 153,078.30 euros. Sintra Ingenieros will repair the heating at Getafe Air Base, tendered at 56,074.60, and Ingenia Soluciones para la Ingeniería will manage a redevelopment in Pinto. Móstoles settled the shade canopy for the Plaza de Pradillo and Valdemorillo three premises in the bullring. The refurbishment of the San Ramón Centre in Parla had already been settled earlier.
Developers and builders contribute 66 of every 100 founding euros of the 53 newcomers the BORME records

- Only Santa Cruz de Tenerife and Valencia outdo the Madrid Sur comarca in new firms. The BORME, the Official Gazette of the Companies Register, where new companies, capital changes and closures must be published by law, published from 3 to 6 November 53 incorporations in the Madrid Sur comarca, with 428,829 euros of share capital, the money the partners put in when founding the company (3, 4, 5 and 6 November). That is nine fewer than the 62 of the previous week, yet still the third highest figure among the 21 comarcas of the day.
- Eleven belong to the property trade and total 281,228 euros. They are one in five of the companies and contribute 66 per cent. The largest, a developer in Parla, starts with 150,000 euros, and Casas de Savia, also from Parla, with 70,000. Navalcarnero adds three from the sector, among them Sevilla Gestión 2027, and Fuenlabrada launches Wonder Homes Living Sistem, with 20,228.
- Fuenlabrada and Alcorcón register eight each. Behind them come Móstoles, with 7, and Parla and Leganés, with 5. The rest are spread across eleven other municipalities, from Navalcarnero and Getafe to Arroyomolinos and El Álamo (BORME of 5 November).
Leganés closes its Los Frailes tender on Tuesday 10, first of six deadlines that fall before the 16th

- Six procedures fall due within seven days. The works in the Leganés park start the countdown, with bids until Tuesday 10. San Martín de Valdeiglesias takes proposals until Thursday 12 for the Plaza Real and the classroom at the San Martín de Tours school, El Álamo until Friday 13 to manage a new housing development (UA-3b), and Getafe and Torrejón de Velasco until Monday 16 for their industrial areas and two streets.
- Villa del Prado and Alcorcón wait until the 17th and the 19th. Villa del Prado is renewing the street lighting on Avenida del Hospital, and Alcorcón is hiring the technical stage services for its cultural programme.
- Five social rent flats wait on a Rozas de Puerto Real contractor. The five homes close on Thursday 26, a day after the storage warehouse in Villanueva de Perales. The last, until 25 January 2027, is the public land concession for a cohousing residential centre in Navalagamella, a permit to use public land exclusively for a set period.
Navalcarnero assesses offers to operate the cemetery and funeral complex, tendered at 6.49 million before VAT

- The Navalcarnero funeral complex heads 40 pending tenders. Navalcarnero has under assessment, meaning the public body is assessing the bids and has not yet chosen a company, the contract to run the funeral complex and extend the cemetery, worth 6,488,714.25 euros before VAT.
- Fuenlabrada, Móstoles and Alcorcón hold on to their large works packages. Fuenlabrada awaits a company for a framework agreement for Sustainability and Public Space works, a contract that sets, for several years, the terms of the jobs given to one or more companies, worth 5 million, and for the Huerto del Cura Urban Park. Móstoles is assessing the works on municipal buildings, worth 3,595,041.32, and Alcorcón the Ensanche Sur sports complex, worth 2,498,929.99.
- In Parla, Valdemoro and Moraleja de Enmedio bidding closed in October. That was the case for the Parla green corridor, tendered at 1,652,864.73 euros, the pitch turf at the Valdemoro football ground and the resurfacing in Moraleja de Enmedio, and Batres is still studying the paving of Calle Serranillos. They add up to 40 tenders in 19 municipalities, worth 33.29 million before VAT, and Alcorcón and Getafe have the most, six each.
Humanes de Madrid keeps its municipal plots unsold while it weighs offers, tendered at 6.3 million before VAT

- Three town councils sell public land. The sale in lots of municipal plots in Humanes de Madrid, published in August, is still under assessment and has no buyer yet. Getafe is studying bids for plot 6.2 of the Churruca implementation unit (UE-6), in El Rosón, and Griñón for another municipal plot.
- Alcorcón and Leganés move public housing forward. Alcorcón closed in October its land concession for affordable rent. EMSULE, Leganés's municipal land company, is assessing the maintenance and the caretaking of its rental buildings, and Fuenlabrada the legal advice on housing. With the enlargement of the Plaza de la Parra in Colmenar del Arroyo, the seven operations with an amount total 9.94 million.
- Sierra Oeste households may claim 8 million in urgent housing grants. The regional Department of Housing, Transport and Infrastructure published on 6 November in the National Grants Database, the public register where every administration announces its grants, the call, the notice that opens the window to apply for a grant, for the urgent grants to renovate homes damaged by the Sierra Oeste fires. It shares out 8 million among private individuals with no economic activity, and the window to apply will be two months from when the agreement appears in the Official Gazette of the Community of Madrid, the official journal of the regional government and its town councils.
- Getafe opens its citizen card for basic needs. Getafe City Council has called the grants to cover basic needs through the 2026-2027 citizen card, with 700,000 euros for private individuals and applications until 24 July 2027.
Look up on the map the CasasValue of any building in Fuenlabrada, Navalcarnero or Leganés
Fuenlabrada's railway crossing and Navalcarnero's sports Phase III head the Madrid Sur comarca this week. Small contracts were settled in Chapinería, at the military facilities in Getafe, in Pinto, in Móstoles and in Valdemorillo, and works awarded earlier remain in Parla, in Serranillos del Valle, in Torrejón de la Calzada and also San Martín de Valdeiglesias. Leganés invites proposals on its park, as do El Álamo for a housing development, Torrejón de Velasco for two streets, Villa del Prado for its lighting, Alcorcón for its cultural stage work, Villanueva de Perales for a warehouse, Rozas de Puerto Real for its flats and Navalagamella for a residential centre. Unassigned so far are the Valdemoro turf, the Moraleja de Enmedio resurfacing, the Sevilla la Nueva access, the Humanes de Madrid schools, a street in Batres, the padel roofing in Colmenar del Arroyo, the Villamantilla promenade and the restoration tendered by Griñón. Arroyomolinos gains one new company. Navas del Rey, Aldea del Fresno and Pelayos de la Presa did not move any contract this week, and Cenicientos, Colmenarejo, Villamanta, Casarrubuelos, Cadalso de los Vidrios, Cubas de la Sagra and Quijorna record no items over the week.
Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Madrid Sur Análisis y Negocios Semanal is published by CASAS.ES.