Gijón comarca · No. 7 · Friday 20 November 2026 · 7-minute read
Gijón City Council seeks offers until 11 December to maintain the Arco Medioambiental, €2.46 million
CASAS.ES Newsroom · AI · Official sources
(Madrid time)
In the city of Gijón, twelve works worth €6.99 million sit unawarded, and 71.1% of that money goes on renewing the railway tracks of El Musel port. Gijón City Council also wants bids to maintain the Arco Medioambiental, €2.46 million, until 11 December. Villaviciosa has three unawarded contracts and Colunga has one. Across the Gijón comarca 18 companies are founded, whose largest capital, €50,000, belongs to a Gijón city property developer.
Two lots and €2.46 million to care for the Arco Medioambiental of the city of Gijón, bids until 11 December

- The Arco accounts for almost everything still open. The Junta de Gobierno of Gijón City Council, the governing board chaired by the mayor, on 11 November published the maintenance and works on the spaces of the municipality's Arco Medioambiental as a public tender, in which companies bid, in two lots, offered to bidders at €2,461,383.72 excluding VAT, before tax, with a deadline of 11 December. The three tenders in the Gijón comarca still accepting proposals this Friday add up to €2,751,677.33, and the Arco makes up 89.5% of that figure.
- Los Campos replaces its school wall. Gijón City Council has another tender open, the renewal of the boundary wall at the Los Campos state school, tendered at €47,124 excluding VAT, open until 25 November. It is the second deadline to expire, after the El Musel optical fibre one, and the nearest for a small civil engineering builder.
- El Musel replaces and extends its optical cabling. The Autoridad Portuaria de Gijón, the public body that runs the Port of Gijón, El Musel, is still taking bids to replace, restore and extend the port's fibre optic network, with a tender price of €243,169.61 excluding VAT. It is the most urgent opportunity for a telecoms installer in the comarca.
- Pinzales sports court roof goes to PROMOGRADO. The roof over the sports court at the Pinzales state school, tendered for €144,609.62 excluding VAT, appears as resolved in favour of PROMOGRADO SL. The portable toilets for the Sunday Rastro market, budgeted at €17,704.96 excluding VAT, are also listed as resolved, with no company on record.
Twelve Gijón city works worth €6,985,882.14 sit unawarded as their offers are scored

- Roces La Braña replaces its old schools. The Empresa Municipal de la Vivienda de Gijón is contracting the design and works to demolish the old Roces La Braña schools and put up a new building, tendered at €320,151.98 excluding VAT. The deadline closed on 10 November, as did the one for a storage unit converted into social emergency housing, for €88,842.87 before VAT in the tender.
- The railway track grids at El Musel, on hold. The Autoridad Portuaria de Gijón is assessing bids to renew the track grids at the South station of El Musel, with a tender value of €4,966,653.21 excluding VAT. That is 71.1% of the total for the twelve city works still without a company. Gijón City Council is also weighing up bids for the refurbishment of the Edificio Asilo Pola, tendered for €524,664.06 net of VAT, the largest of its eleven.
- The Piles Peñafrancia cycle link awaits a decision. The cycle section along avenida Albert Einstein, linking the Piles river path with Peñafrancia, with a tender budget of €306,686.36 excluding VAT, is under assessment, meaning the public body is assessing the bids and has not yet chosen a company. So are the fire protection at the Centro de Cultura Jovellanos, for €226,306.39, and the waterproofing of the Museo del Ferrocarril de Asturias, for €123,493.99.
- Façades, green space, Pajarera, changing rooms and school playground are also waiting. Still pending are the façades of the Alfonso Camín state school (€112,464.98), the green space on calle Matilde de la Torre (€103,304.28), the Pajarera in Isabel la Católica park (€89,500.01), the changing rooms at the La Calzada sports complex (€62,150.56) and the playground at the Gloria Fuertes school (€61,663.45), all without VAT.
Villaviciosa and Colunga gather six contracts worth €729,824.11, from local roads to the Viular

- Villaviciosa's road upkeep tender has shut. Villaviciosa town council has already closed the deadline to maintain and improve its municipal roads and streets, tendered at €320,467.91 excluding VAT, and still has no company. Under assessment are the interior refurbishment of the day centre for older people, for €151,757.66 with European NextGenerationEU funds, and the water pipe to Careñes and Villaverde, for €67,283.50.
- Colunga plans industrial land and improves the Viular. The opening and improvement of tracks in the Viular, tendered at €99,859.54 excluding VAT, is being assessed. Already listed as resolved is the commission for the plan parcial, the detailed development plan, of the Colunga industrial estate tendered for €14,950 excluding VAT, as is the restoration of the Torre de Lastres, for €75,505.50, and no company appears in the register.
- Carreño registers an electrical business. ELECVALLES ENERGIA Y CLIMATIZACION, an electrical installation company in Carreño, was founded with €1,000 of capital, according to the BORME of 12 November. Carreño, Cabranes and Caravia do not appear this week in the Plataforma de Contratación, the official portal where public bodies publish their tenders for works and services.
Eighteen companies in the weekly BORME for the Gijón comarca, led by a €50,000 developer from Gijón city

- ADOBER and its €50,000 top the 18 of the week. The BORME, the Official Gazette of the Companies Register, where new companies must be published by law, brought 18 companies from the Gijón comarca between 12 and 19 November. The one with the most capital, the money the partners put in when founding the company, is ADOBER INVERSIONES INMOBILIARIAS SL, with €50,000 to buy, build, develop and let property in the city of Gijón, as published in the 12 November BORME. AURA BYGG CONSTRUCCIONES Y REFORMAS was also set up that day, with €3,500.
- Four companies for refurbishment or construction. After the previous edition went out, between the 13th and the 19th of November, 11 of them arrived, with €45,350 of capital between them. Four work in renovation, assembly or building. They are AQUAREFORMAS KB and Mejoras A.B.D (BORME of the 13th), REFORMAS INTEGRALES SYLMA and an assembly and works firm from Villaviciosa (of the 19th). HABITARIA NORTE (of the 17th) is created to buy, sell and let property.
- Villaviciosa puts €13,800 on the table. The Villaviciosa company for assembly and works starts with €13,800 of capital, the highest figure in that stretch, while eight of the eleven chose €3,000. The city of Gijón also gains a holding company, a company whose business is holding shares or stakes in other companies, MC BUSINESS REAL ESTATE MANAGEMENT, per the 17 November BORME.
- Regional government money for business. The Servicio Público de Empleo del Principado de Asturias, the Asturian regional government's autonomous body that runs employment policy, registered a direct grant, a grant awarded without competition to a specific recipient, in the cases the law allows, which compensates companies for what they spend on Formación Profesional Dual 2026, the dual vocational training scheme. Another goes to the Cámara de Comercio de Avilés, the public-law chamber that represents and serves the businesses of its area, for the Feria del Talento Joven in the city of Gijón. Both have a fixed recipient and cannot be applied for. An open call, the notice that opens the window to apply for a grant, is the one from the Consejería de Derechos Sociales y Bienestar, the regional social rights and welfare department, for the Juventud Asturiana Cooperante 2027 programme, registered on 13 November. Who can apply, how much it gives and until when are set out in the official listing.
In the city of Gijón, the town hall gathers bids to maintain the Arco Medioambiental and to renew the boundary wall at Los Campos school, El Musel is taking them to renew its optical cabling and scoring those for its railway tracks, and eleven more municipal works, from Asilo Pola to Roces La Braña, remain unawarded. Villaviciosa, pending a contractor, wants its municipal viario kept up, the senior day facility reformed and water piped to Careñes, and Colunga likewise awaits one for its Viular road works. Carreño adds an electrical company. Cabranes and Caravia logged nothing this week, whether contracts or incorporations.
Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Gijón Análisis y Negocios Semanal is published by CASAS.ES.