Analysis🏠 My home

Analysis / Comarcas / El Bierzo comarca / 13 November 2026

EL BIERZO ANÁLISIS Y NEGOCIOS SEMANAL

El Bierzo comarca · No. 6 · Friday 13 November 2026 · 5-minute read

New paving for Fabero streets at 169,983 euros, the costliest El Bierzo contest in a week

(Madrid time)

Between 5 and 12 November the El Bierzo comarca published the Fabero streets and the accessibility works at Priaranza del Bierzo town hall, 333,543 euros in newly published works. Bembibre now names the builder for climate works at its ambulatorio, while Almázcara, in Congosto, is rerunning its tender, which closes on Sunday 15th.

Priaranza del Bierzo to install a town hall lift, tendered at 163,560 euros

El Bierzo, 13 November 2026. Eight municipal works, four stages of the process
Municipal works in El Bierzo in the data package, by tender stage. El Bierzo, 13 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • Priaranza del Bierzo wants to spare its residents the stairs. On 5 November the council published the town hall accessibility upgrade, with a lift. It is a licitación, a public tender where companies submit bids, at 163,560.13 euros before VAT, before taxes. Bids close on 25 November.
  • Almázcara welcomes proposals for a fresh municipal building until Sunday 15th. Congosto, its municipality, is rerunning the tender for the building, put out at 175,638.93 euros before VAT, after the first closed with no winner published. The deadline for the improved access to La Era, in Congosto, tendered at 67,968.02 euros, closed on 6 November.
  • Toreno, Camponaraya and Toral have firms signed up. The Toreno town hall lift went to JOBENSA SOLUCIONES EN ELEVACIÓN, tendered at 87,781.54 euros before VAT. TÉCNICAS CONSTRUCCIÓN SEVEMUL is restoring the Casa Moruna in Camponaraya, for 98,922.43 euros, and the municipal roofs of Toral de los Vados, for 199,052.56 euros. The roof of the annexe in Ponferrada of the Mancomunidad Municipios Agua del Bierzo, a grouping of town councils that provide a service together, tendered at 62,942.15 euros, is being assessed, so the public body is studying bids and has yet to choose a company.

Bembibre picks DAFRICA BIERZO for the climate system of its ambulatorio, 331,725 euros in tendered work

El Bierzo, 13 November 2026. Two health centres with a company and one still open
Works by the Gerencia de Asistencia Sanitaria del Bierzo in the data package, by stage. El Bierzo, 13 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • DAFRICA BIERZO will overhaul airflow and temperature in the Bembibre ambulatorio. The Gerencia de Asistencia Sanitaria del Bierzo completed the adjudicación of the outpatient clinic works this week, the step in which the public body chooses the company that will do the work. It was tendered at 331,724.79 euros before VAT and paid for with oral health funds.
  • DAFRICA BIERZO wins again after Ponferrada IV. The renovation of Ponferrada IV, tendered at 140,720 euros before VAT, is also theirs, with the same funds.
  • Ponferrada II awaits electricians until the 23rd. The replacement of the electrical transformer station at the outpatient clinic is still open, tendered at 80,268.60 euros before VAT.

Fabero, the Botillo and six El Bierzo contests where no builder has won yet

El Bierzo, 13 November 2026. The two Carracedelo street schemes top the list
Contracts in this section by tendered amount, euros before VAT. El Bierzo, 13 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • Fabero is to resurface a number of streets. Fabero published the paving of streets in the municipality, tendered at 169,982.52 euros before VAT on 6 November, taking bids until 26 November.
  • Bembibre hires the Botillo festival and closes proposals on Tuesday 17th. Bembibre is hiring the 2027 Festival del Botillo, tendered at 84,628.10 euros before VAT.
  • Six contests past deadline, no firm picked. They add up to 790,798.98 euros before VAT. The largest, in Carracedelo, are Calle del Campo and the streets of Posada del Bierzo, with no company since bidding closed on 14 September. The roof over the San Andrés de Montejos court and the lighting on Calle Camino de Santiago, in Ponferrada, and the Mancomunidad hire of machinery with driver are being assessed, so the public body is studying bids and has yet to pick one. The deadline for the Bembibre parks closed on 9 October.

Eight municipal contracts in El Bierzo go to EXCARBI or CONSURVI DEL BIERZO

El Bierzo, 13 November 2026. Ponferrada leads the works with a company
Contracts with a chosen company in the data package, by municipality of the works. El Bierzo, 13 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • EXCARBI racks up four jobs in Ponferrada. EXCARBI, the limited company to which Ponferrada awards street works, won the urbanisation of Ciudad Bérgida and the Camino Francés, the access roads to neighbourhoods, Avenida de Galicia and Avenida de Astorga, which add up to 409,295 euros tendered before VAT.
  • CONSURVI DEL BIERZO is working in Villafranca and Camponaraya. It is building the wall on Calle Espíritu Santo and working on the Teatro Gil y Carrasco in Villafranca del Bierzo, plus the pavements of La Válgoma and the paving of several villages in Camponaraya, for 230,717 euros tendered in total.
  • Toreno shares the work among specialists. ASFALTOS FERSIL is paving Calle los Tilleros and Orus Eléctrica is renewing the street lighting, for 143,700.67 euros before VAT. In Bembibre, Ovisa Pavimentos y Obras has the streets of Bembibre and San Esteban del Toral, tendered at 138,341.78 euros before VAT.
  • Further villages have picked a construction firm. Maga Estudios y Construcciones is upgrading public spaces in Vega de Espinareda, PILSAN BIERZO is extending the Las Médulas visitor reception centre, in Carucedo, and MONDO IBERICA is renewing the Compostilla pitch in Ponferrada. Obras y Construcciones Serjo will do works in several villages of Priaranza del Bierzo, and Castropodame has already chosen a builder for its paving. The cemetery wall in Toral de los Vados closed its tender with no winning bidder published.

Industrial estates and sport in Ponferrada get new grant calls

El Bierzo, 13 November 2026. Six in ten of the week's grants already have a recipient
Grants and subsidies of the week in the data package, by who can apply. El Bierzo, 13 November 2026. Source: National Grants Database · CASAS.ES · CC BY 4.0
  • Upgrading an industrial estate has a new provincial line. The Diputación de León, the provincial council, registered its convocatoria to modernise industrial estates on 6 November, the notice that opens the window to apply for a grant.
  • Ponferrada opens its annual line for sport. Ponferrada city council published its public call for grants for sporting activities 2026 on 11 November.
  • The Diputación published its 2026 Grants for Entrepreneurs this week. There are lines for other sectors and agriculture. Their titles do not say whether they can be applied for or have a fixed recipient.
  • The payments for the summer wildfires arrive without an application. The Junta de Castilla y León, the regional government of Castile and León, approved payment batches XII and XIII for the self-employed and small businesses in the evacuated villages, and direct grants for damaged farms. They are not applied for.

See the CasasValue of buildings in Ponferrada on the map

Between 5 and 12 November, the El Bierzo comarca brought out the Fabero paving contest, ending on the 26th, plus an elevator for Priaranza del Bierzo town hall, for 333,543 euros before VAT. Congosto closes bids for the Almázcara building on the 15th, Bembibre closes those for the Botillo on the 17th, and its ambulatorio gets a fresh contractor for climate works. EXCARBI signs four jobs in Ponferrada, CONSURVI DEL BIERZO two in Camponaraya and two in Villafranca del Bierzo, while Toreno modernises street lighting and paving and Carracedelo waits for a company for two street schemes. Carucedo, home to Las Médulas, Castropodame, Toral de los Vados and Vega de Espinareda all count a signed contract. Cacabelos, Molinaseca, Arganza, Sobrado, Igüeña, Balboa, Cubillos del Sil, Peranzanes, Barjas, Torre del Bierzo, Borrenes, Vega de Valcarce, Corullón, Sancedo, Puente de Domingo Flórez, Berlanga del Bierzo, Oencia, Páramo del Sil, Folgoso de la Ribera, Valle de Ancares, Trabadelo, Noceda del Bierzo and Cabañas Raras had no contracts this week.

Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. El Bierzo Análisis y Negocios Semanal is published by CASAS.ES.

📰 Journalist or publisher? You can republish this analysis and its charts for free under CC BY 4.0, as long as you credit CASAS.ES and link to this page.

Source: CASAS.ES, El Bierzo Análisis y Negocios Semanal, 13 November 2026. https://casas.es/en/analysis/el-bierzo/2026-11-13/new-paving-fabero-streets-169983-euros/

RSS