Camp de Túria comarca · No. 8 · Sunday 15 November 2026 · 5-minute read
The Bétera pipeline, at €4,818,322.33, is 75.5% of all open bidding in its comarca, Camp de Túria
CASAS.ES Newsroom · AI · Official sources
(Madrid time)
Bidding closes on 11 December, and this week's BORME adds 13 companies in the entire Camp de Túria comarca.
SUBICO OBRAS is to demolish the sports fronton courts at la Pobla de Vallbona

- The wrecking ball reaches la Pobla. La Pobla de Vallbona hires SUBICO OBRAS for the demolition of the fronton courts at the Ciudad Deportiva, tendered at €68,644.88 before VAT, before tax.
- Riba-roja wraps up the Casco 5 review. The review of the development project for the Casco 5, Vella 6 and Pous 6 execution unit, an area developed in one go with costs and benefits shared among the owners, is settled. The tender is over and the contract has been closed, with Consultora Valenciana d'Enginyeria and Xúquer-Arqing.
- Xelardo road bids under study. In Llíria, the public body is assessing the bids and has not yet chosen a company for the design and site supervision of the private road in the Xelardo, tendered at €7,265.13 before VAT.
Twin developers in l'Eliana open a week of 13 new companies

- L'Eliana sees two twin developers founded. VITEPAS BENIMAMET and SAN JUSTO 2026 are registered in the BORME of 12 November, the Official Gazette of the Companies Register, where new companies, capital changes and closures must be published by law. Each puts in €3,000 of share capital, the money the partners put in when founding the company, to develop and sell property.
- L'Eliana adds four new firms and San Antonio the best funded. The BORME of 13 November adds two hospitality companies in l'Eliana. The best capitalised, with €22,501, is in San Antonio de Benagéber (BORME).
- Gardening and refrigeration get new companies. In Náquera, M10 Servicios Integrales y Gestión is founded with €13,000 (BORME), and in Riba-roja de Túria an industrial refrigeration company (BORME).
- Seventeen housing plots still have no buyer. La Pobla de Vallbona is selling 17 residential plots in Vista Calderona for €1,419,649.69 before VAT. The deadline closed on 28 October and it has not yet chosen a buyer.
Bétera holds the bulk of open tenders and Náquera closes its water plant on the 23rd

- Reverse osmosis for the Mont-Ros well, deadline the 23rd. The reverse osmosis plant at the Pozo Mont-Ros in Náquera, which treats water with membranes to make it drinkable, is a public tender, in which companies bid to carry out works or a service. It accepts proposals until 23 November for €1,501,415.25 before VAT.
- Padel and new access at La Pedralvilla. Olocau receives bids until 25 November for the padel court and access roads at La Pedralvilla, tendered at €60,000 before VAT.
- Bétera takes almost everything. The supply pipeline from the metropolitan reservoir in Bétera, tendered at €4,818,322.33 before VAT, accepts bids until 11 December and is 75.5% of the €6,379,737.58 open.
- Llíria opens grants for residents with coeliac disease. On 9 November Llíria announced in the BDNS, the National Grants Database, the public register where every administration announces its grants, grants for people with coeliac disease.
Riba-roja and Benaguasil head a queue of thirteen unawarded contracts

- Joan Martorell, first. Riba-roja is assessing the redevelopment of Calle Joan Martorell up to Calle Sagunto, at €964,851.31 before VAT, and the refurbishment of the La Mallà building, at €275,617.42.
- Benaguasil resurfaces on two fronts. The resurfacing of streets and rural roads, at €627,269.44 before VAT, and the repaving of Calle Pedralba, at €414,209.51, are waiting for a company.
- A Loriguilla bridge awaits its builder. The bridge over the Pozalet ravine, damaged by the 2024 DANA, an isolated low-pressure system high in the atmosphere, which can bring heavy rain, was tendered at €758,440.12 before VAT.
- Serra restores a watchtower and the Sant Josep hermitage. Serra is restoring the Torre del Señor, at €293,684.52, and the Sant Josep hermitage, at €49,586.78. Bétera is assessing its accessibility plan for public streets, at €434,051.26, and Vilamarxant its green spaces, at €261,106.22. All before VAT.
- Street lights, a picnic area and a sewer, with no company. Náquera has pending the street lighting of La Loma, at €147,598.83, and the Plà de Parra recreation area, at €121,666.92. Vilamarxant adds a sewage collector, at €64,369.68, and Bétera the hire of decorative lighting for the town, at €87,520. All before VAT.
Mas Camarena leads the 22 contracts already closed

- Mas Camarena will gain capacity with PAVASAL. The enlargement of the Mas Camarena reservoir in Bétera, with PAVASAL, a construction company, tendered at €4,164,673.23 before VAT, is 35.7% of the €11,651,662.43 of the 22 contracts awarded or settled.
- Loriguilla rebuilds its drainage after the flood. The attenuation ponds draining to the Pozalet ravine tendered at €1,751,705 before VAT, belong to Servicios, Estudios, Obras y Mantenimientos. The widening of another Pozalet bridge, tendered at €658,504.16, belongs to Altuna y Uria.
- A new Plaza Mayor for Llíria. The remodelling of the Plaza Mayor and its surroundings, tendered at €1,310,408.02 before VAT, is being built jointly by Electrotecnia Monrabal and Valle d'Or Valencia. PAVAGUA Ambiental, a single-member private limited company, has the drinking water network along the CV-35, at €459,003.92.
- Asphalt for l'Eliana, streets and play area for Marines. Marines has settled the redevelopment of Calle Miguel Hernández, Calle Gátova and Calle Colón, with SERCYOVAL, at €454,901.03, and its play area in the Parque del Real, at €133,280, with SUBICO OBRAS. L'Eliana has its 2026 resurfacing works, at €240,783.74. All before VAT.
Find the CasasValue of every building in Marines on the CASAS.ES map
Until 11 December, Bétera accepts candidates for its water pipeline, 75.5% of the amount out to tender. Náquera and Olocau shut their windows on 23 and 25 November. La Pobla de Vallbona entrusts SUBICO OBRAS with demolishing the fronton courts and wants someone to buy 17 Vista Calderona plots, Riba-roja de Túria closes the Casco 5 review and Llíria is studying the Xelardo road and announces grants aimed at coeliacs. L'Eliana registers four of the 13 new companies and San Antonio de Benagéber the one with most capital. Benaguasil, Loriguilla, Serra and Vilamarxant keep their adjudications open, and Marines closed its park and street jobs with SUBICO OBRAS and SERCYOVAL. Benissanó, Casinos and Gátova saw no company founded and no tender published that week.
Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Camp de Túria Análisis y Negocios Semanal is published by CASAS.ES.