Analysis🏠 My home

Analysis / Comarcas / Axarquía comarca / 22 November 2026

AXARQUÍA ANÁLISIS Y NEGOCIOS SEMANAL

Axarquía comarca · No. 9 · Sunday 22 November 2026 · 7-minute read

Vélez-Málaga takes 88.3% of the works moved from 14 to 21 November and a Vélez-Málaga company puts in €1,059,000

(Madrid time)

In the Axarquía comarca, four works with news between 14 and 21 November reach €2,336,797.04 and Vélez-Málaga accounts for €2,063,573.38 through a pair: the development entrusted to PRODESUR and the pavements framework agreement, open until 9 December. ALDAN CAPITAL INVERSIONES SL, of Vélez-Málaga, contributes €1,059,000 of the €1,558,229 raised by the 21 new companies, 68.0%.

Vélez-Málaga adds up €2,063,573 from one development already awarded and new pavements

Axarquía, 22 November 2026. Two Vélez-Málaga contracts weigh €88 in every €100
Tender value before VAT of the four contracts that moved from 14 to 21 November. Axarquía, 22 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • SUO.B-5 in Vélez-Málaga gets its builder. The Junta de Gobierno, the body made up of the mayor and some of the councillors, of Vélez-Málaga city council now has a company for the completion of the development works in sector SUO.B-5, suelo urbanizable ordenado, land zoned for development whose detailed layout is already set in the general plan, tendered at €1,237,127.10 before VAT. The company chosen in the tender, a public competition in which firms bid, is PRODESUR CONSTRUCCIÓN Y PROYECTOS, S.L.
  • Pavements town-wide, open to bidders. On 19 November the same city council published a framework agreement to maintain, repair and improve pavements and public spaces across the whole municipality, tendered at €826,446.28 before VAT. A framework agreement is a contract that sets, for several years, the terms of the jobs given to one or more companies. Bids are open until 9 December.
  • A second framework agreement, this one for the asphalt. The framework agreement for the paving of Vélez-Málaga's public roads, tendered at €1,611,570.25 before VAT, is still being assessed, the council is studying the bids and has not yet chosen a company. The deadline closed on 5 October.

The Torrox resurfacing closes on Monday 23, with Almáchar, Nerja, Colmenar and Vélez behind it

Axarquía, 22 November 2026. Torrox closes in one day, Colmenar in 18
Open tenders in the comarca, by last day for bids. Axarquía, 22 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0

From the Torrox-Costa pitch to the Periana school, 15 contracts closed for €6,664,269

Axarquía, 22 November 2026. The Torrox-Costa pitch outweighs the other four combined
Stage and tender value before VAT of five closed works in the comarca. Axarquía, 22 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • The Periana school settles its changing rooms. The changing rooms, toilets and storeroom at the sports courts of the San Isidro state infant and primary school in Periana, tendered at €70,951.79 before VAT, are listed as resolved, the tender is over and the contract has been closed, no company published.
  • Torrox-Costa, €54.7 in every €100 of these 15. Phase II of the new Torrox-Costa football pitch, tendered at €3,642,602.34 before VAT, is 54.7% of the €6,664,269.27 in this section. In Algarrobo the car park on Calle Antonio Ruiz Rivas and Calle Platero was resolved, and in Torre del Mar the redevelopment of Calle Doctor Fleming.
  • FCC Aqualia takes on the Torrox water supply. FCC Aqualia S.A., a water management company of the FCC services and construction group, appears in the improvement of the Torrox drinking water supply, tendered at €194,214.88 before VAT. Firms are also in place for the water on Calle Buenavista in Algarrobo, tendered at €129,110.74, the extension of the Benamargosa gym, tendered at €181,000.83, and Calle Miguel Serrano in Caleta de Vélez, tendered at €79,069.35.
  • Heritage, health and festivities. Companies are in place for the Casa Museo Nazarí in Cútar, a Nasrid house museum, tendered at €76,680.16, the Sayalonga health centre, tendered at €44,571.58, and a mixed contract in Alfarnate with DIMOTECH DISEÑO INDUSTRIAL SL, tendered at €73,630.80. Resolved are the Lagos tower, the car park square in Cómpeta, the air conditioning of a building in Torrox-Costa and the electricity for the Nerja fair. All before VAT.

Nerja's PA-2 Castillo Alto is 75.1% of €8,699,210 in streets and water awaiting a company

Axarquía, 22 November 2026. Fourteen of the fifteen works stay below €352,000
Value before VAT of 15 street and water works without a company, one per dot. Axarquía, 22 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0
  • Castillo Alto takes €75 of every €100. The development of phase 2, east zone, of sector PA-2 Castillo Alto in Nerja, tendered at €6,529,803.06 before VAT, has awaited a company since bids closed on 4 November.
  • El Cantal and Maro await the result. The resurfacing of Avenida El Cantal, Calle Acacias and the Villalobos lane in Rincón de la Victoria, tendered at €351,239.67 before VAT, closed bids on 11 November. In Maro, the redevelopment of Calle Cantarero, at €281,304.10, and in Nerja the isolated actions AA-14 and AA-35, at €171,523.49, are still being assessed.
  • Three Vélez-Málaga roads still in the balance. Awaiting a company are the repairs to pavements and carriageway in the Vélez-Málaga sectors SUO.CH-4, at €227,353.60, and SUO.CH-3, at €196,000.51, and in implementation unit CH-7, at €75,288.07. The underground bins in central Nerja, at €258,500.00, closed bids on 9 November.
  • Colmenar, Cómpeta, Sayalonga and Alcaucín are also waiting. Still without a company are the Jaldarín water supply and the sewerage of Calle Acera del Sol in Colmenar, Calle San Antonio in Cómpeta, the rural roads of Torrox, the excavators of Sayalonga and Corumbela and the Plan Básico de Ordenación of Alcaucín, the planning instrument Andalusian land law provides for small towns, tendered at €175,000.00 before VAT.

Courts, roofs, a riverbed and a cave, €4,248,749 of Axarquía works still unassigned

Axarquía, 22 November 2026. Rincón de la Victoria and Nerja, the two largest circles
Value before VAT of eight facilities without a company, by municipality. Axarquía, 22 November 2026. Source: Public Sector Procurement Platform · CASAS.ES · CC BY 4.0

Of 21 newborn Axarquía firms, one Vélez-Málaga outfit supplies 68.0% of the starting money

Axarquía, 22 November 2026. One company puts in more than the other twenty combined
Capital of the seven largest new companies, from 16 to 19 November. Axarquía, 22 November 2026. Source: Official Gazette of the Companies Register · CASAS.ES · CC BY 4.0
  • Housing firms carry the weight. The BORME, the Official Gazette of the Companies Register, where new companies, capital changes and closures must be published by law, recorded from 16 to 19 November 21 new companies in the Axarquía comarca, with €1,558,229 of capital, the money the partners put in when founding the company. ALDAN CAPITAL INVERSIONES SL, of Vélez-Málaga, puts in €1,059,000, 68.0%. Ten of the 21 have as their main activity developing, managing, letting, brokering or building property.
  • Seven new firms in Vélez-Málaga and six in Rincón. Vélez-Málaga has 7, Rincón de la Victoria 6, Nerja 3, Torrox 2 and Algarrobo, Periana and Sedella one each. Among them, the developer NOVA HOMES COSTA DEL SOL SL, in the BORME of 16 November, and the builder DON TECHO OBRAS Y REFORMAS SL, in the one of 19 November.
  • Nerja offers a municipal unit to buyers. Nerja town council is studying bids for the sale of a property in the Balcón de Europa building, tendered at €526,151.86.
  • La Noria prize, Frigiliana awards and two named grants. The Diputación de Málaga, the provincial government, approved the 7th La Noria Social Entrepreneurship Prize, a convocatoria, the notice that opens the window to apply for a grant, and Frigiliana announced its awards for outstanding athletes of 2026. The Diputación also granted a subsidy to Alfarnate town council for the Japanese decorative features of Sakura Alfarnate and another to the Agrupación Malacitana de Jóvenes Empresarios, the Málaga young entrepreneurs' association, for its Málaga Territorio emprendedor programme. That money already has a recipient.

Compare on the CASAS.ES map the CasasValue of buildings in Vélez-Málaga, Nerja or Rincón de la Victoria

PRODESUR will finish SUO.B-5 in Vélez-Málaga, where the council tenders its pavements and three further streets remain undecided. Colmenar wants pitchside locker rooms built and weighs offers on the Jaldarín water supply. Torrox closes its resurfacing on 23 November, Nerja UE-39 on the 26th and Almáchar its ethnographic centre on 2 December. Nerja weighs offers on PA-2 Castillo Alto and the public foundation of its cave on the cleaning. In Rincón de la Victoria, El Cantal and a basement car park are being weighed too. Algarrobo, Canillas de Albaida, Alcaucín, Salares, Cómpeta and Sayalonga have courts, streets or buildings pending a company. Periana closes the San Isidro school file, while Cútar, Benamargosa and Alfarnate have a contractor. Frigiliana announces sports awards, Sedella welcomes one firm, and in Totalán, Iznate, Árchez, Moclinejo, Viñuela, Riogordo, Comares, Macharaviaya, Arenas, Benamocarra, Alfarnatejo, Canillas de Aceituno and El Borge there was no recorded activity.

Every figure links to its official document. If something does not add up, reply and we will correct it within 24 hours. Axarquía Análisis y Negocios Semanal is published by CASAS.ES.

📰 Journalist or publisher? You can republish this analysis and its charts for free under CC BY 4.0, as long as you credit CASAS.ES and link to this page.

Source: CASAS.ES, Axarquía Análisis y Negocios Semanal, 22 November 2026. https://casas.es/en/analysis/axarquia/2026-11-22/velez-malaga-takes-works-moved-21-november/

RSS